To-Do List [updated]
Just less than a month has passed since I bought this pile and it’s actually starting to take shape. I’m amazed by all the help I’ve had from everyone. I’m finally able to imagine a finished product. My dad has been inspirational. He’s put loads of work and thought into getting stuff done right. I don’t think I could ever repay him for his hard work and dedication. My mom has been cleaning and scrubbing until her lungs are burnt and she’s brain damaged from inhaling chemicals. Kristin’s parents (the future in-laws) have done wonders to the trees and yard. Mike Carter has been the head-guts behind the major construction and Brian and Kim have helped tons too. Thanks guys!
Here’s my to-do list as of today.
- Finish the hole into the very depts of Hell. (New subfloor in the bedroom) [incomplete]
- Texture living room. [incomplete]
- Prime kitchen and living room. [incomplete]
- Hang Drywall. [incomplete]
- Install new carpet [incomplete]
- New bathroom floors. [incomplete]
- New bathroom sink/cabinet. [incomplete]
- Install Laminate flooring. [incomplete]
- Run some new electric wires. [incomplete]
- New light fixtures in kitchen and front room. [incomplete]
- Relocate Washer/Dryer. [incomplete]
- Frame basement. [incomplete]
- Remove Gail’s damn RV!! [incomplete]
- Some lite demolition. [complete]
- Weather seal all windows and doors. [complete]
- Clean out the tenant’s (Robert “Super-G” Hines) stuff. [complete]
- Clean out my uncles’ stuff. [complete]
- Remove old carpet. [complete]
- Scrub/Dust/Vacuum/Sanitize entire house. [complete]
- Prep floors for Laminate installation [complete]
- Prep work for painting wood paneling. [complete]
If there’s something you’d like to tackle let me know, and donations via paypal are welcome as well.
Email the $$ to tool.fool@gmail.com